Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Mar 22, 2008     Avionics access door; Rudder pedals - (.8 hour)       Category: Fuselage
The AN-3 bolts that mount the aft end of the rudder slider bar to the floor are screwed into two nutplates in the floor. In the QB fuselage, these nutplates are already installed. One of the two accepted the bolt with no problems, but the other had to be tapped with a 10-32 tap in order to accept a bolt. I took care of that today.

I also began laying out the 0.032" doubler that will surround the avionics access-door. I traced the piece of bulkhead that I previously cut out, then I added 3/4" to the top and side dimensions.

Finally, I primed the components of the pedal adjustment latch. I'll paint them when the weather warms up, then rivet them together.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.